What if my roof needs work first?: solar sales
The short answer
Tell the buyer the roof comes first if it needs to. Ask the roof's age, material, and any leaks. Look at it together or get photos. If it is near its end, plan the roof job and the panels in the right order. If it is sound, say so and show the next step.
Take the 3-minute sample callWhy buyers say it
The buyer was either told the roof is old or fears someone will say so. Panels stay up there for years, and nobody wants to pay to unbolt them for a new roof. The question is half objection, half honesty test: will you tell me to fix my roof even if it costs you the sale?
How reps lose the deal on it
- They say it is no problem and the panels will protect the roof. If it leaks a year later, the buyer remembers who waved it off.
- They treat the roofing job as a delay to their own sale. The buyer feels like a deal on hold, not a person with a house to protect.
- They send the buyer off to find a roofer with no plan. Nothing connects the two jobs, and the buyer never returns.
The steps, in order
- Ask the roof's age, material, and any leaks.
- Look at it together or get photos.
- If it is near its end, plan the roof job and the panels in the right order.
- If it is sound, say so and show the next step.
Stronger lines to say
- “Good question, and I would rather you ask it now than after the panels are up. How old is the roof, and has anything ever leaked?”
- “If the roof is near the end of its life, do the roof first. I would tell you that even though it moves my sale. Panels belong on a roof you will not be taking them off again.”
- “Send me a few photos of the roof and, if you can, the attic. I will tell you what I see. If I am not sure, I will say so and suggest a roofer look first.”
A call that goes right
Example exchange. The buyer and the call are fictional.
- BuyerWhat if my roof needs work first? It’s not exactly new.
- RepThen the roof comes first. How old is it, and has it ever leaked?
- BuyerIt’s older than I’d like. There was a stain on the hall ceiling once, and a roofer said it was fine.
- RepThat stain matters. Can you send photos of the roof above that spot? I will tell you what I see, and if I am unsure I will say so instead of guessing.
- BuyerYou’d say that just to hold off the sale until I buy a new roof too, wouldn’t you?
- RepI understand why it sounds that way. Get your own roofer’s opinion, not one I pick. I would rather lose a month than put panels over a leak you will blame me for.
- BuyerOkay, fair. I’ll send the photos tonight and talk to a roofer.
- RepGood. After that we will know the order: roof first, or panels now. Either way I will put the plan in writing so nothing is a surprise.
Same line, different meanings
| The buyer says | Usually means | Say instead |
|---|---|---|
| “My roof is twenty years old.” | They know the age and fear it is too old, but nobody has told them either way. | “Then let us have someone look at it before either of us guesses. One honest inspection, and then we pick the order.” |
| “I’ll need a new roof in a few years.” | They want to delay everything, and the roof is a handy reason. | “That is the time to plan together. If the roof is coming anyway, doing both in order means panels never come off again. Do you know roughly when?” |
| “A roofer told me not to put anything on it.” | A warning from someone they trust, and no way to weigh it. | “What did he say, the condition or the idea? If it is the condition, he is probably right. Can I see what he wrote?” |
| “I don’t want holes in my roof.” | The fear is leaks from mounting hardware, not age. | “That is a fair worry. Ask any installer how they seal each mount and who is responsible if one leaks. I will give you my answer in writing.” |
When to let the buyer go
If the roof is failing and the buyer cannot do the roofing job for a while, say plainly that solar should wait. Offer to look at roof photos once the work is done, leave the system design on paper, and ask for no date. You lose a month and keep a customer who knows you would not sell them a leak.
Questions reps ask about it
What do I say when a customer asks what if my roof needs work first?
Say the roof comes first if it needs it, and mean it. Ask the age, the material, and whether it ever leaked. Offer to read photos or inspect it. Then lay out the order of the jobs. That honesty is what convinces a worried buyer.
How old is too old for a roof before installing solar?
No single age decides it. Material, workmanship, past leaks and the decking underneath all count. Use your company's roof assessment, and when a call is close, have a roofer look first.
Should the roof be replaced before or at the same time as the solar?
Either can work, provided the roof is sound before panels go on it. One combined schedule means panels never come down again. Say plainly what your company can coordinate and what the buyer must arrange. Do not promise a combined schedule you cannot deliver.
What if the roof inspection finds a problem after the customer signs?
Prevent the surprise: before signing, explain what happens if the roof fails inspection, what is in writing, and what the buyer can walk away from. Follow your company's contract and compliance rules, and make sure the buyer reads that section.
How do I keep the customer when they need a roof first?
Stay useful during the roof job. Write the system design with a note that the plan is paused, ask when the work finishes, and agree on a call after. Offer to look at the finished roof. A buyer who had to wait and was treated well comes back.
Related objections
Hear a buyer push back
The free call uses a sample scenario. Answer out loud, hear the buyer push back, and try a stronger answer.
The buyer is AI and the company is fictional. Want the whole team practicing? See pricing.