RepCabin

Just send me your rate for that lane: logistics

Objection guide: Logistics. Written by the RepCabin team. Updated .

The short answer

Ask about the freight before you send a number. A rate with no details is only a number to beat. Get the commodity, the weight, the dates and the equipment, then quote a rate that fits and say what it assumes. Offer to cover the first load at that price and call before pickup. Do not email a number cold.

Take the 3-minute sample call

Why buyers say it

A rate request is how a shipper checks the market without a conversation. It costs them nothing and gives them a price to hold against the broker they use. They are comparing, not committing.

How reps lose the deal on it

  1. They send a rate without asking about the freight. The shipper compares it to a rate for a different load, and the number looks high.
  2. They send the lowest rate they can. When the truck costs more, the rep drops the load or adds fees.
  3. They send the rate and wait. The shipper never answers because nobody asked for a next step.

The steps, in order

  1. A rate with no details is only a number to beat.
  2. Get the commodity, the weight, the dates and the equipment, then quote a rate that fits and say what it assumes.
  3. Offer to cover the first load at that price and call before pickup.
  4. Do not email a number cold.

Stronger lines to say

  • “Sure. What’s it moving, how much, and when does it need to pick up? That way the rate’s real, not a guess.”
  • “Here’s my rate and what it assumes. If any of that changes, I’ll tell you before the truck, not after.”
  • “If it’s close, give me that one load. I’ll call you at pickup and again at delivery, so you can see how we work.”

Questions reps ask about it

Which details change a truckload rate the most?

Equipment type, pickup and delivery windows, weight, whether the lane is a headhaul or a backhaul, the day of the week, and extras like liftgate, detention or multiple stops. Ask for each before you quote. A rate that skips one of them gets renegotiated the morning of the pickup.

How do I avoid a race to the bottom?

Quote what you can deliver, with the terms. Offer a first load, not a contract. Compare on service the shipper cares about, like on time pickup and updates. If you cannot win on price, say so.

What should a lane rate note include?

The lane, the freight, the equipment, the pickup date, what the rate includes and what could change it. Add a line saying you will call before pickup. A clear note beats a low number with no terms.

Hear a buyer push back

The free call uses a sample scenario. Answer out loud, hear the buyer push back, and try a stronger answer.

Take the 3-minute sample call

The buyer is AI and the company is fictional. Want the whole team practicing? See pricing.